Public Works 

Valdez Park Pavilion:
Construction of Park Pavilion Structure with 1.5" thick asphalt pad in N. Meyring Park
Cooper River Native Association Roof:
Replacement of Platform Roof
GSA JFB Lobby Flooring: Replacement  and install flooring in the main entry vestibule and lobby of the Juneau Federal Building.
GSA JFB Front Door Replacement: 
Replaced Juneau Federal Building Front Entry Doors.
ASD Ptarmigan Elementary School Roof Replacement: Replacement of Ptarmigan Elementary School
JBER Cemetary Expansion-
Install 1,654 Pre-Placed Crypts and 1,838In-Ground Cremains and Alterations to site such as grading, curb and gutter, drainage, side walks and pavers.
Talkeetna Waste Water Treatment Plant Phase 1-Install two new concrete anaerobic cells, baffle curtains, an approximate 1,300 SF treatment building.
GSA KFB Parking Lot Restripe- Restripe the parking space markings in the parking lot of the Ketchikan Federal Building.

 

UAA RAS WEIDNER CLASSROOM-
The work consists of demolition of partition walls and new construction, storefront, electrical, mechanical and AV design

 

Seldovia School Shop Fire Restore-
Repair fire damage to include damaged roofs, floors, walls, asbestos removal, fire suppression system, electrical, lighting, dust collection and HVAC systems, Life Safety and ADA requirements, and replacement of weight room.

 

Kenai Middle School Abatement and Roof Replacement-Consists of abatement, removal and replacement of mansard roof members, removal and replacement of BUR roof. Footprint area of school is approximately 74,000 SF.

 

Kana ADA Improvements Phase 1-3:  Demolition and renovation to improve ADA access for the behavioral health facility.
Combined Renovation KANA Main: Renovations to the KANA Main Building which includes:  LED Lighting Upgrades, VAV Box Replacement, Ceiling Tile Replacement,  Mechanical Systems Repair & DDC Upgrades, Air-handler Damper Replacement.
Wasilla Pool Renovation: 
Renovated the existing Wasilla Pool facilities and Mechanical System upgrades.

 

GSA Skagway, Alaska Border Station Culvert Heat Repair- Repair the existing culvert snow melt system on the US side of the border station.

 

Bartlett HS Cafeteria and Kitchen Renovation-  
 Cafeteria and kitchen renovations at Bartlett High School

 

CRNA-Main Campus Remodel-
Remodel existing Pharmacy/Behavioral Health and Board Spaces.
JBR016 Obstacle Course Upgrades- 
Demolish existing components, equipment, structures, and finishes. Install new obstacles.  Provide gravel pad at entry of new vault toilet.  
UAS Juneau Technical Center Phase II- Renovate approx. 7,400 SF of occupied spaces, to include demolition, cutting, exterior siding, windows, doors, frames, partitions, finishes and mechanical and electrical systems.
FTW381 Taku  Garden Housing-

Make Ready-Refurbish (110) Family Housing Units and Mechanical Buildings.

UAA KPC Ward Offices Phase II-
Renovation of existing offices in the Ward Building.
 
Kenai Senior Center and Snowmelt-
Replace the snowmelt boiler, controls, and mechanical room delivery systems at CIHA's Chuda House Facility.
Assets Inc. Roof Replacement Phase II-Demolition of approximately 15,000 SF of built up roof, fiber board and asbestos mastic. 
Gakona Multi-Purpose Facility-Addition- construction of a 1,982sf wood framed addition to the existing Health Clinic and Multi-Purpose Building in Gakona.
Chugiak High School Pool Renovation-  Remove/reinstall pool deck equipment and tile.


 

Anchorage Federal Building/ US Courthouse Replacement on (6) Penthouse Roofs-Removed and replaced the roofs on (6) penthouses at the Anchorage Federal Building/US Courthouse in Anchorage, Alaska.
Mat-Su Borough Windows-Removal and Replacement of windows in building.


 

Morgan Landing- 
General Construction to fabricate and install new fishing platforms, an ADA fishing platform, ramps and stairs. Also modify existing piles and fishing platforms.
 
Reflections Lake Pedestrian Bridge-Project consisted of constructing a 95-foot  pedestrian bridge over Reflections Lake.
F-22 Weather Shelter-
Supply and Install Casework, ceramic tile, resilient flooring, countertops at Elemendorf, Alaska


 

GSA Boiler Flues Replacement


 

UAA Kenai Bathroom
 


 

Kenai Courthouse Counters-Demolition of existing walls, doors, counters, cabinets, base, data and electrical systems, and the installation of new and similar components and systems. 
Lake Hood Trooper Hanger-Alteration of 1130 SF of an Aircraft Hanger to become an accessory storage area, with a storage mezzanine above.  
Mears Middle School Locker Replace-Replacement of all student lockers.


 

Mt. Iliamna Elementary School Multipurpose room-Orion modified existing multipurpose room to support installation of resilient athletic flooring and physical education equipment.
AWW Roof and Walls


 

F-22 Squadron-Orion installed casework for entire squadron building.


 

AVTEC Culinary-
The Alaska Institute of Technology (AVTEC) Culinary remodel required demolition and installation of new food service equipment in the dishroom, bakery, and main kitchen.
UAA University of Alaska
 


 

© 2023 BY CREATIVE CORNER. PROUDLY CREATED WITH WIX.COM

info@mysite.com    500 Terry Francois Street San Francisco, CA 94158

  • Facebook Basic Black
  • Twitter Basic Black
  • Instagram Basic Black