Public Works 

Talkeetna Waste Water Treatment Plant Phase 1-
 Install two new concrete anaerobic cells, baffle curtains, an approximate 1,300 SF treatment building.

 

GSA Design/Build Roof (s) Replacement Juneau Federal Building- Replacement of four roof sections along with the existing fall restraint system.

 

GSA KFB Parking Lot Restripe- Restripe the parking space markings in the parking lot of the Ketchikan Federal Building.

 

UAA RAS WEIDNER CLASSROOM-
The work consists of demolition of partition walls and new construction, storefront, electrical, mechanical and AV design

 

Seldovia School Shop Fire Restore-
Repair fire damage to include damaged roofs, floors, walls, asbestos removal, fire suppression system, electrical, lighting, dust collection and HVAC systems, Life Safety and ADA requirements, and replacement of weight room

 

Kenai Middle School Abatement and Roof Replacement-Consists of abatement of hazardous materials above the ceiling, removal and replacement of mansard roof members, removal and replacement of BUR roof over new rigid insulation, adding wall insulation and new fascia and wall metal panels. Footprint area of school is approximately 74,000 square feet.

 

 

 FTW381 Taku  Garden Housing-

Make Ready-Refurbish (110) Family Housing Units and Mechanical Buildings.

Kenai Senior Center and Snowmelt-
Replace the snowmelt boiler, controls, and mechanical room delivery systems at CIHA's Chuda House Facility.
 


 

Gakona Multi-Purpose Facility-Addition- construction of a 1,982sf wood framed addition to the existing Health Clinic and Multi-Purpose Building in Gakona.


 

Chugiak High School Pool Renovation-  Remove/reinstall pool deck equipment and tile.


 

Anchorage Federal Building/ US Courthouse Replacement on (6) Penthouse Roofs-Removed and replaced the roofs on (6) penthouses at the Anchorage Federal Building/US Courthouse in Anchorage, Alaska.
Mat-Su Borough Windows-Removal and Replacement of windows in building.


 

Morgan Landing- 
General Construction to fabricate and install new fishing platforms, an ADA fishing platform, ramps and stairs. Also modify existing piles and fishing platforms.


 

Reflections Lake Pedestrian Bridge-Project consisted of constructing a 95-foot  pedestrian bridge over Reflections Lake.
F-22 Weather Shelter-
Supply and Install Casework, ceramic tile, resilient flooring, countertops at Elemendorf, Alaska


 

GSA Boiler Flues Replacement


 

UAA Kenai Bathroom
 


 

Wasilla Pool Improvements-Renovate the existing Wasilla Pool facilities
 

 

GSA Skagway, Alaska Border Station Culvert Heat Repair- Repair the existing culvert snow melt system on the US side of the border station.
 

 

Bartlett HS Cafeteria and Kitchen Renovation-  
 Cafeteria and kitchen renovations at Bartlett High School

 

CRNA-Main Campus Remodel-
Remodel existing Pharmacy/Behavioral Health and Board Spaces.

 

JBR016 Obstacle Course Upgrades- 
Demolish existing components, equipment, structures, and finishes. Install new obstacles.  Provide gravel pad at entry of new vault toilet.  Demolish existing Vault Toilet and replace with new one.

 

UAS Juneau Technical Center Phase II- Renovate approx. 7,400 sq.ft of occupied spaces, to include demolition, cutting, exterior siding, windows, doors, frames, partitions, finishes and mechanical and electrical systems.


 

UAA KPC Ward Offices Phase II-
Renovation of existing offices in the Ward Building.
 


 

Assets Inc. Roof Replacement Phase II-Demolition of approximately 15,000 s.f. of built up roof, fiber board and asbestos mastic. Construct new joists and metal decking over existing roof and connect to CMU wall. New roof system consists of EPDM Membrane


 

Kenai Courthouse Counters-Demolition of existing wall, door, counters, cabinets, base, data and electrical systems, and the installation of new and similar components and systems. 
 

 

Lake Hood Trooper Hanger-
Project is a Type 2 alteration of 1130 s.f. of an Aircraft Hanger to become an accessory storage area, with a storage mezzanine above.  


 

Mears Middle School Locker Replace-Replacement of all student lockers.


 

Mt. Iliamna Elementary School Multipurpose room-Orion modified existing multipurpose room to support installation of resilient athletic flooring and physical education equipment
AWW Roof and Walls


 

F-22 Squadron-Orion installed casework for entire squadron building.


 

AVTEC Culinary-
The Alaska Institute of Technology (AVTEC) Culinary remodel required demolition and installation of new food service equipment in the dishroom, bakery, and main kitchen.


 

UAA University of Alaska
 


 

© 2023 BY CREATIVE CORNER. PROUDLY CREATED WITH WIX.COM

info@mysite.com    500 Terry Francois Street San Francisco, CA 94158

  • Facebook Basic Black
  • Twitter Basic Black
  • Instagram Basic Black